Before the forecast becomes the plan

Pre-Hurricane Commercial Roof Prep Checklist

Build one property-specific readiness file for roof records, access, baseline photographs, vendors, drainage responsibility, interior response, and safe post-storm documentation.

Request a Pre-Storm Roof Assessment
Ocean Group Construction · Florida licenses CCC1332364 and CGC1504639
Property readiness fileBuild before the storm
01
OrganizeRecords, contacts, access, and authorization
File
02
DocumentCurrent conditions, drainage, and equipment
Baseline
03
CoordinatePeople, vendors, interiors, and communication
Plan
04
Respond safelyAccess, observations, stabilization, and routing
Sequence

Life safety comes first.

Follow official emergency instructions and the building’s approved emergency plan. Keep unqualified personnel off the roof during unsafe weather, lightning, high winds, active flooding, or other hazardous conditions. Use the appropriate qualified parties for roof access, equipment, electrical work, tree work, drainage, and temporary protection.

Four-stage field guide

Prepare the file. Protect the decision path.

The week a storm threatens Florida is the wrong time to discover that roof information is scattered across five people and three inboxes. Work through the stages now, then print the page for the property file.

01

Organize the roof information file

Put the facts, authority, and access path in one place.

Roof Command file: Store the current version where authorized decision-makers can reach it even if the usual manager is unavailable.
02

Establish a current-condition baseline

Document what is accessible and observed without overstating what photographs prove.

Evidence discipline: A visual record documents accessible observed conditions at a point in time. It does not prove concealed damage is absent or determine future storm causation, insurance coverage, or warranty coverage.
03

Coordinate equipment, access, and communication

Make responsibility visible before urgent work begins.

The roofing contractor should not be presented as responsible for equipment or trades outside its contracted scope. Avoid unauthorized work that may damage the roof or affect warranties.
Stage 04 / response sequence

Decide the safe sequence before the storm.

A clear routing path reduces confusion without promising access, arrival time, coverage, causation, or a result.

01Follow official instructions.
02Confirm safe property access.
03Keep unqualified personnel off-roof.
04Record safe observations.
05Assess accessible conditions.
06Document temporary work.
07Route the next decision.
Know the boundary

What this checklist cannot promise.

No outcome guarantee

  • It cannot guarantee that a roof will not leak or sustain damage.
  • It cannot guarantee that temporary work will be possible in unsafe conditions.
  • It cannot guarantee a response time unless a signed agreement states it.

No coverage or causation decision

  • It does not determine storm causation, insurance coverage, or warranty coverage.
  • Photographs alone do not prove causation, compliance, or absence of concealed damage.
  • It does not replace emergency plans, engineering, code review, insurer requirements, or manufacturer requirements.
Build the file before the storm builds it for you

Request a Pre-Storm Roof Assessment

OGC can review available roof records, accessible conditions, active concerns, and documentation needs, then define whether an inspection, repair scope, or Roof Command structure is appropriate.

Call 786-696-4829 →

Start the property readiness file

Tell us which Florida property needs a clearer pre-storm roof record.

Your form details are used to respond to your request and are not sent to Google Analytics.