Coastal high-rise roofing case study
A Tapered Modified-Bitumen Reroof Built to Direct Drainage.
Ocean Group Construction served as the roofing subcontractor under a national restoration contractor serving as GC at Windward Condominiums. OGC installed the specified tapered modified-bitumen system, with slope configured to direct water toward the roof drains.
Ponding water increases exposure at seams and roof details. On a high-rise, correcting the roof assembly requires more than replacing the surface membrane: the tapered insulation layout must be installed to direct drainage toward the roof drains.
The verified roofing role
Why OGC was selected for the roofing scope.
OGC served as the roofing subcontractor under a national restoration contractor serving as GC. The verified scope was a tapered modified-bitumen reroof. OGC removed the existing assembly as required, installed the specified tapered layout, and completed the modified-bitumen roof system within the GC’s project schedule. The tapered design was specified for the project; this page does not attribute engineering services to OGC.
A high-rise roof with ponding or a specified tapered reroof? Start here.
The project record
Seven pinned frames from the Windward roofing scope.
When drainage is the problem, the roof assembly needs designed slope.
Windward demonstrates OGC installing a specified tapered modified-bitumen system as the roofing subcontractor within a larger restoration. The system layout directs drainage toward the roof drains without implying that OGC provided project engineering.
More roofs we were trusted with →
Put the roof on the record
A high-rise roof with ponding or a specified tapered reroof? Start here.
Tapered modified-bitumen installation by a dual-licensed roofing contractor. 786-696-4829.