SIRS and milestone inspections solve different problems. This guide explains the distinction and shows where contractor roof evidence fits without crossing into reserve, engineering, or legal work.
Does my Florida condo need a SIRS?
Florida law generally requires a SIRS for covered association-maintained portions of residential condominium and cooperative buildings that are three habitable stories or higher. Your reserve professional and attorney must confirm whether a specific association and building fall within the statute.
What is a Structural Integrity Reserve Study (SIRS)?
A SIRS combines a visual inspection with a reserve-funding analysis for covered building components. It estimates remaining useful life and replacement or deferred-maintenance cost, then recommends a funding schedule through a qualified reserve professional.
Is the roof part of a SIRS?
Yes, when it is an association-maintained responsibility. The roof is separately identified and evaluated for remaining useful life, anticipated cost, and funding rather than being buried in general repairs.
What is the SIRS deadline?
For condominium associations existing on or before July 1, 2022 and controlled by unit owners, the initial SIRS generally was due December 31, 2025. A covered association with a milestone inspection due on or before December 31, 2026 may complete both together, subject to the statutory deadline and professional guidance.
What is the difference between a milestone inspection and a SIRS?
A milestone inspection is a structural-safety inspection. A SIRS is a reserve study that evaluates covered components—including the roof—and recommends how anticipated work should be funded.
Can our board still waive or underfund the roof reserve?
For covered budgets, required SIRS reserves generally may not be waived or reduced. Florida law contains narrow conditions and temporary provisions, so the association attorney and reserve professional should interpret them for the building.
How can an association fund a reroof?
Florida law recognizes regular assessments, special assessments, lines of credit, and loans as funding methods, subject to voting and other statutory requirements. Financing availability and structure belong with the board, counsel, lender, and financial advisors.
Our reserve study flagged the roof—what now?
A short remaining-life estimate usually calls for a current roof-level condition record and realistic contractor scope, not an assumption that the roof has failed today. Put present evidence beside the reserve number before the board chooses timing and funding.
How does a roofer fit into the reserve process?
A roofer does not sign the milestone inspection or replace the qualified reserve professional. OGC provides contractor-side roof observations, photographs, service-life input, and realistic scope and cost information for the board and reserve team to evaluate.
Who are the authorities on my building’s requirements?
The reserve-study professional handles the SIRS, the engineer or architect handles structural judgment and milestone work, and association counsel interprets legal duties. OGC stays in its lane: the roof.